1·To replace the drilling line wrapped around the crown block and traveling block.
为更换缠绕在天车和游动滑车周围的钻井钢丝绳用。
2·The text detailedly introduced crown block, running system, availability work period of bridge girder erection equipment and improve case for precast beams install.